logo

VANCOUVER, BRITISH COLUMBIA–(Marketwired – July 27, 2016) – Unity Energy Corp. (TSX VENTURE:UTY)(FRANKFURT:UJN2) (“Unity” or the “Company“) is pleased to announce that it has received chemical analysis from its first pass drilling and sampling program on its 100% owned Miller’s Crossing Lithium Project in Esmeralda County, Nevada. The drilling was intended to follow up on positive surface sampling, which was carried out in April 2016 and confirmed presence of lithium in alluvial gravels and clays. A total of 7 holes were completed, generating 22 intersections of interest. All holes encountered brown clays as well as silty brown sands and grey fine to coarse-grained sand. In addition, two water samples were collected where the water table was encountered within the drill-hole as well as two anomalous salt samples at surface.

Source: Unity Identifies Lithium Through Short-Hole Drilling at Miller’s Crossing Lithium Project, Nevada – Investing News Network